commitment group

Industrial Partner

REPLACEMENT OF MAIN AND AUXILIARY BURNER SYSTEMS ...

Ecostar  /  Commitment Group  /  Project Sivas Kangal Turkey Thermal Reactor  / 
Ecostar / Commitment Group / Project Sivas Kangal Thermal Power Plant / As the project commitment group, we provide supply, installation and commissioning services for any kind of steam boiler where the steam is used in energy generation and processing.

In addition, our project commitment groups provide disassembly of the existing system and preparation of the system upon demand.
...

AUTOMATION AND CONTROL SYSTEMS

Ecostar  /  Commitment Group  /  Project Automation  /  
For the automation systems, we work together with the world’s giant partner companies

The projects of boiler control equipment, measurement groups and complete automation systems are designed and implemented in line with customer demands. In this way, safer systems are developed and commissioned smoothly

PREPARATION OF FUEL LINES FOR NATURAL GAS, OIL, DIESEL OIL, BIOGAS AND SO FORTH...

Ecostar  / Commitment Group  /  Project  /  
ECOSTAR COMMITMENT GROUP - YOUR STRATEGICAL PARTNER
We design and produce complete fuel lines and necessary control and safety equipment based on the fuel type to be used in the systems. All equipment used in the lines for this purpose has CE and TSE certificates. The installations are tested in compliance with international test standards.
  • ECOSTAR

    Wide product range, correct solutions, products with 23-11.000KW capacity interval in Gas burners, oil burners and dual-fuel domestic burners, and with 594-57.000KW capacity range in industrial burners

    The first and only TSE-certified Gas Process Burners with 80.000-2.500.000 kcal/h capacity range

  •  

  •  

  • head offıce

    Ataturk Cad. Sami Bey Sok. No:4 34843 Maltepe
    Istanbul, TURKEY

    Tel: +90 216 442 93 00 (pbx)
    Fax: +90 216 370 45 03
    Email: export@ecostar.com.tr
    Web: www.ecostarburners.com